OVERHAUL 1999 - 2000

spacer
spacer
spacer

This interesting collection of pictures was taken during Blackmoor Vale's recent overhaul in the Locomotive Works, Sheffield Park. The overhaul enabled many parts to be viewed that are normally hidden. They are split into three sections:

1) Locomotive

2) Valve Gear (showing parts that are normaly enclosed in the oil bath between the frames)

3) Tender (including the construction of a new body).

All photographs are courtesy of the Villa Team.

Clicking on the pictures below will bring up a bigger version in a new window.

Large versions (1280 x 1024) and other pictures are available on the Villa Team page click here

spacer

LOCOMOTIVE

spacer
spacer
Firebox Boiler Boiler

Ultrasonic stay testing in the combustion chamber, 14 February 1999

View of the right side showing new boiler lagging and pipework,
28 February 1999

Left side of locomotive taken at the same time,
28 February 1999

spacer
Cab Cab Wheels

New cab panel sheeting fitted and overhauled injectors in place,
28 February 1999

View of the cab showing fittings being replaced and new pipework,
7 March 1999

Driving wheelset with machined journals and remetalled axlebox,
21 November 1999

spacer
Lubrication Pipes Lubrication Front Painting

Lubrication pipes under repair and test,
2 January 2000

New lubrication pipework being installed at the front of the locomotive,
11 March 2000.

Painting in progress,
13 August 2000

spacer
spacer

VALVE GEAR

spacer
spacer
Oil Bath Actuating Shaft Tree Throw Crankshaft

A rare view of the inside of the oil bath showing the chain drive and valve gear,
21 November 1999

The middle cylinder valve actuating shaft,
16 January 2000

The chain driven three-throw crankshaft,
16 January 2000

spacer
Reverser Valve Gear Parts Valve Heads

Repaired reverser being reassembled,
28 February 1999

The valve gear parts laid out on the tender chassis,
16 January 2000

New valve heads,
5 March 2000

spacer
spacer

TENDER

spacer
spacer
Tender Frames Tender Frames Body Constuction

Work underway on tender frames,
25 July 1999

Tender frames reassembled and painted,
6 November 1999

Construction of new tender body showing coal space,
16 January 2000

spacer
Body Constuction Tender Back Tender Side

Rear view of steelwork for tender body,
16 January 2000

Tender body mounted on frames awaiting fitting of electric wiring and lamps,
4 June 2000

New tender body showing lockers and coal shute,
4 June 2000