The smoke deflector have been made from new steel sheets, however the handrail stanchions come from the existing ones. This is the left-hand side one having the beading attached.

spacer
spacer
spacer
Smokebox
spacer
spacer

The lighting conduits being fitted to the smokebox.

spacer
spacer
Firebox Stays
spacer

Firebox stays being fitted.

The numbers around the firebox, in yellow, are the diameter of the stay size required for the stay hole

spacer
spacer
spacer
spacer
Flexible Stays
spacer
spacer

The welding of the firebox flexible stays has been completed.

spacer
spacer
spacer
spacer

July 2007

spacer
spacer
spacer
spacer
Steam Pipe Plating
spacer
spacer

The new smokebox with platework for the steam pipes being trial fitted.

spacer
spacer
spacer
Firebox repair
spacer
spacer

Firebox repairs are now concentrating on the bottom corners. The picture shows the fettling of the new foundation ring corner sections. The new corner sections are being cut-out from sheet boiler steel and shaped in the hydraulic press.

spacer
spacer
Chassis View
spacer

View from cab forwards with the boiler in the distance.

spacer
spacer
spacer
spacer
spacer

May 2007

spacer
spacer
spacer
spacer
Nameplate Front
spacer
spacer
spacer

Is this the beginning
of the end?

The nameplate holders have been cut out and the nameplate and plaque have been trial fitted.

spacer Nameplate Side
spacer
spacer
spacer
spacer
spacer

No. 34059's overhaul progresses with further firebox repairs taking place. The inner firebox plate below the firehole door has been cut out and the stays removed.

spacer
spacer
spacer
Firebox Inserts
spacer
spacer

The new plate on the lower section of the firebox on the fireman's side has ben tack welded in position and now awaits welding and then the drilling and tapping of the stay holes. There has been trial fitting of the new corner sections of the foundation channel, which can be seen in place.

spacer
spacer
spacer
Cab and Tender
spacer
spacer

Together again but the meeting may well be brief. The tender is in the works as space outside is tight and it will enable some rubbing down of the paintwork and repainting of some areas.

Work is progressing on the injection to clack valve pipework, with only one major section awaiting completion.

spacer
spacer
spacer
spacer

April 2007

spacer
spacer
spacer
spacer
Boiler General View
spacer
spacer

The boiler has now been inverted with the base of the firebox now uppermost to allow more welding on the syphon patches and the diaphragms and for additional sections of the rear inner firebox plate adjacent to the foundation ring to be cut out for new plate. All the lower sections of the firebox will then have been removed for replacement with new plate.

spacer
spacer
spacer
Thermic Syphon Repairs
spacer
spacer

The welding work carried out on the syphons.

spacer
spacer
spacer
spacer

January 2007

spacer
spacer
spacer
spacer
Injectors
spacer

Pipework for the injectors has been delivered and is being fitted to the injectors and connected to the pipe runs along the footplating. Work is progressing on the overhaul of the AWS equipment, most of which is now to hand. Work on the cab is almost complete and much preparation and painting has been undertaken of the cab and the new sheeting. The ashpans (bottom of the picture) are being overhauled and painted where necessary.

spacer
spacer
U Sections
spacer

We are forming the new sections for the syphons on site using the preformed U sections manufactured by Pridhams