RESTORATION 2006

spacer
spacer
spacer

November 2006

spacer
spacer
spacer
spacer
Thermic Syphons
spacer
spacer

The bottom section of the firebox has been cut out and new sheeting is being cut to be welded into place. The twenty six flexible stays and cups which surround the syphon plugs have been removed and will be replaced with new ones, owing to the amount of corrosion.
(Photo: © Richard Green)

spacer
spacer
spacer   Cab

The re-clad cab has now been painted.

Photo: © Richard Green
spacer
spacer
Front Buffer Beam
spacer
spacer

The front of the rolling chassis showing the new platework around the valve pockets plus the box for the battery. When 34059 is completed it will have fully working AWS. (Photo: © Richard Green)

spacer
spacer
Drain Cocks
spacer
spacer

The cylinder cocks and their associated pipework have been fitted.
(Photo: © Richard Green)

spacer
spacer
spacer

May 2006

spacerspacer
spacer
spacer
spacer Boiler on Side spacer
spacer

The boiler of No.34059 has been turned to facilitate work on the firebox. (Photo: © John Fry)

spacer
spacer
spacer   Firebox

New firebox tubeplate and throat plate section in place. The welding is yet to be completed.

The thermic siphons also
require replacement sections to be welded in place,

Photo: © John Fry
spacer
spacer Cab Re-clad spacer spacer

The cab roof being re-clad.

Photo: © John Fry
spacer
spacer
spacer   Window Framws

The right side wooden window frame in place.

Photo: © John Fry
spacer
spacer
spacer
spacer

April 2006

spacerspacer
spacer
spacer

The boiler of No.34059 is now being actively worked on by the workshop staff. The new firebox tubeplate has been tack welded in position and awaits an inspection prior to final welding by a coded welder.

spacer
spacer Throatplate spacer
spacer

The section of the throatplate that has ben removed is being prepared for the insertion and welding in place of the new plate formed by Roger Pridham. (Photo: © John Fry)

spacer
spacer
spacer   Foundation Ring replacements

Further work is being undertaken on the new sections of the foundation ring prior to their machining and eventual welding.

Photo: © John Fry
spacer

Stud holes for the boiler top fittings are being cleaned and re-tapped. The large and small tube holes in the front tube plate are being cleaned and prepared for eventual tube fitting, a task that will also have to be undertaken on the new firebox tube plate.

On the engine chassis, work is proceeding on the running plates where paint work has suffered.

spacer
spacer Cab Work spacer spacer

The re-cladding of the cab is well underway and we now have new window frames which will enable cladding in this area to be accurately cut.

Photo: © John Fry
spacer
spacer
spacer
spacer

March 2006

spacerspacer
spacer
spacer

Now that space is available in the workshop the boiler and cab have now been taken off the chassis to enable work to be carried out easily.

spacer
spacer Boiler spacer
spacer

The boiler has been positioned at the back of the workshop. The chassis can be seen behind, with the cab behind that. (Photo: © John Fry)spacer

spacer
spacer Middle Connecting Rod spacer
spacer

The middle connecting rod was fitted on Tuesday 21st February. This view (taken from below) shows the crosshead and union link. (Photo: © John Fry)

spacer
spacer Crank Axle spacer spacer

The crank axle (taken from above) with the eccentric strap on the right.

Photo: © John Fry
spacer
spacer
spacer   Boiler Top

This picture is interesting as it clearly shows the original safety valve holes in front of the dome, which have been blanked-off.

Photo: © John Fry