|
 |
|
|
|
|
|
|
|
Special Work Carried Out / Notes
|
 |
3/4/47
|
|
|
|
|
|
|
Boiler No.1313.
Tender No.T3310. |
 |
15/12/47 |
- |
23/12/47 |
|
|
|
|
Wedge shaped cab fitted. |
 |
1/48 |
|
|
|
|
|
|
T2009 - Reservoir for mechanical lubricators. |
 |
7/2/48
|
|
|
|
|
|
|
T2102 - Springs for whistle valves.
T2162 - Bronze bushes, Anti-attrition Brakes.
T2162 - Both fitted by Motive Power Department |
 |
16/2/48 |
- |
23/2/48 |
|
|
|
|
S prefix added. |
 |
1/4/48 |
- |
20/4/48 |
|
Nine Elms |
|
|
- |
 |
31/1/49
|
- |
11/3/49 |
|
|
|
|
Renumbered 34059.
Boiler No.1307 fitted.
Tender No.T3289 attached. |
 |
27/2/51 |
- |
7/4/51 |
|
|
|
|
Repainted in BR livery. |
 |
9/3/53 |
- |
28/3/53 |
|
|
|
|
- |
 |
9/54
|
|
|
|
|
|
|
Tender No.T3272 attached.
|
 |
23/11/54
|
- |
1/1/55 |
|
|
|
|
264,987 miles since last General Overhaul.
28 modifications.
Boiler No.1350 fitted with boiler pressure reduced and safety valves repositioned behind the dome. |
 |
8/5/56
|
- |
2/6/56 |
|
|
|
|
9 modifications.
TIA recorder removed and connections blanked off. |
 |
5/3/57 |
|
|
|
|
|
|
|
 |
16/1/58
|
- |
8/2/58 |
Heavy Intermediate - upgraded from Light Intermediate
|
|
|
|
4 modifications.
Drain pipe and clip for Tender TIA Doser tank.
|
 |
22/2/60
|
- |
26/3/60 |
|
|
|
|
237,308 miles since last General Overhaul.
2 further modifications.
AWS and Speedometer fitted.
Tender No.T3289 rebodied with 5,250 gallon tank |
 |
7/4/61
|
- |
11/5/61 |
|
|
|
|
|
 |
25/10/63
|
- |
6/12/63 |
Heavy Intermediate - upgraded from Light Intermediate
|
|
|
|
Spring Links.
Anti-glare screen.
Driver's seat.
T2296 - Bogie and coupled springs |
 |
29/4/64 |
- |
30/4/64 |
|
|
|
|
|
 |
29/5/66
|
|
|
|
|
|
|
307,524 miles since rebuilt.
Sold to Woodham Brothers, Barry, South Wales. |
 |
|